Avman Mishab (Al Sidiya and Manthoor) 3km

Status : Completed.

Tender Number and Date: (3/Roads and Bridges/2007)

Execution Period: 120 days

Beneficiary body: Directorate of roads and bridges, Basra Governorate

Project Value: 1,869,250,000 IQD

The work shall include the following:

  • Sand raising works with a height of (1.5 mx9 m) Quantity 71,000 m3
  • Installation of a double arched pipe diameter (1 m) Length (57 M.L)
  • Installation of a steel bridge (H-Pile) Length (35×7m)
  • Supply and laying of mixing Gravel Type C, thickness (15cm) quantity (24,500 m3)
  • Supply and laying of kiri base thickness (10 cm), quantity (2,100 m3)
 

Rehabilitation of Shatt al-Arab Entrance. (Shalamga)

Status : Completed.

Tender Number and Date: (14/Investment plan/2010)

Execution Period: 50 day

Beneficiary body: Directorate of Roads and Bridges.

Project Value: 259,900,000 IQD

The work shall include the following:

  • Supplying materials and constructing concrete side-template of (1500 m) length.
  • Supplying materials and applying the sidewalks with colored Mugarnas bricks (1500 m²).
  • Supplying materials required to spray a primary hot bituminous layer (Prime coat) and applying a layer of bituminous foundation of (10 cm) thickness, (6100 m²).
  • Supplying materials required to apply a hot superficial layer with thickness not less than of (5 cm) thickness (4200 m).
 

Address

915.AL-Jadriyah Baghdad, IRAQ

Phone

+964 773 244 44 70
+964 783 244 44 70

Email

info@aldahangroup.com

Follow us :