Construction Projects

Engineering projects and everything related to building and construction operations

and rehabilitation of civil and industrial facilities

Building a school with 18 classrooms/ 3 floors/ Plot No. 2376/2236

Status : Completed.

Tender Number and Date: 53/28/education/2013

Execution Period: 320 days

Beneficiary body: Directorate of Education of Basara Province

Project Value: 1,484,260,000 IQD

The work shall include the following:

  • Supplying and backfilling by stones (A-B) type and boulder of (8800 m3) Quantity.
  • Excavation works (900 m3)
  • Supplying and casting plain concrete for floors and footbaths, quantity (2604 m²)
  • Supplying and casting reinforced concrete (1115 m3) Quantity.
  • Supplying and building with bricks under and above humidity preventer (15053)
  • Plastering, painting, sanding and dyeing works. (13890 m²)
  • Covering with Kashi-ceramic, and mosaic with , quantity (2330 m²)
     
  • Wooden, steel and aluminum doors and windows works, count (695)
  • Flattening works (885 m²)
  • Supplying, carrying out and covering Bathra with stones and Italian ala baster (105 m²)
  • Supply and installation of steel staircase, count (3)
  • Ceramic removal works, height 10 cm, length 700 m

Building a school that is composed of 18 classes, 3 floors in Turabah area/ Ezzedine Salim Execution

Status : Completed.

Tender Number and Date: (1/Construction/2010)

Execution Period: 150 days

Beneficiary body: The Iraqi Excavation company

Project Value: 474,100,000 IQD

The work shall include the following:

  • Construction using Therma-stone, Dimensions(60×20×20 cm) (500 m3)
  • Armored Concrete works (10 m3)
  • Works of plastering, painting with BORK and plaster, sanding and strewing with cement (6650 m3)
  • Painting works (3780 m²)
  • Ceramic, Alabaster, and porcelain (2685 m²)
  • Reparation works with Shtiger (750 m²)
  • Covering works of the front side with stones and Alabaster (560 m²)
  • Doors and windows works (77), include the main gate (slide)
  • Supply and installation of fans, split units, and lighting points (600)
 

Completion of the second stage of constructing a field hospital in Burjisya

Status : Completed.

Tender Number and Date: (1/Construction/2010)

Execution Period: 150 days

Beneficiary body: The Iraqi Excavation company

Project Value: 474,100,000 IQD

The work shall include the following:

  • Construction using Therma-stone, Dimensions(60×20×20 cm) (500 m3)
  • Armored Concrete works (10 m3)
  • Works of plastering, painting with BORK and plaster, sanding and strewing with cement (6650 m3)
  • Painting works (3780 m²)
  • Ceramic, Alabaster, and porcelain (2685 m²)
  • Reparation works with Shtiger (750 m²)
  • Covering works of the front side with stones and Alabaster (560 m²)
  • Doors and windows works (77), include the main gate (slide)
  • Supply and installation of fans, split units, and lighting points (600)
 