Infrastructure projects in the field of electricity, such as supplying and extending power lines

Creating feeders (33 KV), count (2) in Al Shabiia Station

Status : Completed.

Tender Number and Date: (8/distribution/2007)

Execution Period: 150 days.

Beneficiary body: Basra Directorate of Electricity Distribution.

Project Value: 2,822,500,000 IQD

The work shall include the following:

  •  Providing and supplying antenna line, dual towers type circuits. These towers shall be as per the technical specifications of the medium span for double circuit) (33 & 11 KV lattice steel towers) count (8)
  •  Providing and performing two lines (33 K. V) earth cable type, size (*1 400 mm2) XLPE. The length of each of them is (2000 m) with a total length of (12000 m).
  • Providing an Aluminum wire line 33 K.V, size (210/35 mm2) ACSR with a length of 55000 m.
 

​Rehabilitation of 33 K. V Feeder from East Basrah (11/33/132) K.V to Jubaila station (11/33) K.V

Status : Completed.

Tender Number and Date: (16/ Electricity Distribution /2011)

Execution Period: 120 days.

Beneficiary body: Basra Directorate of Electricity Distribution.

Project Value: 1,764,000,000 IQD

The work shall include the following:

  • Supplying and installation the feeder 33 K. V of earth cable type, size (1×400 mm2) XLPE, the track length is (6000) m. with a total length of the used cable is (18000) m with using the materials required in the work and as per the required technical specifications.
  • Re-paving street and tiling sidewalk as per the municipality specifications.
  • Putting the cables inside a Trieng of a (1) m depth and (0,5) meters width.
 

Supply and installation 11K V feeders form new Hussain Suburb

Status : Completed.

Tender Number and Date: (4/electricity/2013)

Execution Period: 98 days.

Beneficiary body: Directorate of electricity distribution in Basta.

Project Value: 1,286,500,000 IQD

The work shall include the following:

  • Supply, installation and operation of High voltage line 11K V, consisting of 70 high voltage gridded rounded columns 11 m.
  • Supply, installation and operation of High voltage line 11K.V, consisting of 50 high voltage gridded rounded columns 11 m.
  • Supply, installation and operation of High voltage line 11K V, consisting of 2 high voltage columns double cross-over 15m.
  • Supply and installation of Earth Cable 3×150mm? 11K V, Length: 8000m
  • Supply and extension of aluminum cable 20/120K V, Length: 10,000m
  • Supply and installation of circuit breaker capacity A 630 11K V (count 6)
  • Removal of the old electrical cables grid both HV and LV, and removal of the old transformers
 